| Item | Part No. | Part Name | Qty | Serial No. |
| 1 | 20P-46-31111 | FRAME,REVOLVING | 5001-6221 | |
| 2 | 20P-70-71460 | BUSHING | 5001-6221 | |
| 3 | 20P-70-71450 | PIN | 5001-@ | |
| 4 | 07020-00000 | FITTING,GREASE | 5001-@ | |
| 5 | 04082-00514 | LOCK | 5001-@ | |
| 6 | 01010-51440 | BOLT | 5001-@ | |
| 7 | 01643-31445 | WASHER | 5001-@ | |
| 8 | 20N-70-71451 | PIN | 5001-@ | |
| 9 | 20N-70-71621 | SPACER, 1.0MM | 5001-@ | |
| 10 | 04082-00514 | LOCK | 5001-@ | |
| 11 | 01010-51440 | BOLT | 5001-@ | |
| 12 | 01643-31445 | WASHER | 5001-@ | |
| 13 | 20N-70-71461 | PIN | 5001-@ | |
| 14 | 20R-70-11260 | SPACER, 1.0MM | 5001-@ | |
| 15 | 01010-51230 | BOLT | 5001-@ | |
| 16 | 01643-31232 | WASHER | 5001-@ | |
| 17 | 20P-46-71160 | COVER | 5001-@ | |
| 18 | 01435-00612 | BOLT | 5001-@ | |
| 19 | 20P-46-71331 | TUBE | 5001-@ | |
| 20 | 20P-46-71340 | TUBE | 5001-@ | |
| 21 | 20P-46-71350 | TUBE | 5001-@ | |
| 22 | 07831-00411 | SLEEVE | 5001-@ | |
| 23 | 07832-00410 | NUT | 5001-@ | |
| 24 | 20R-46-11160 | CONNECTOR | 5001-@ | |
| 25 | 20R-46-11150 | ELBOW | 5001-@ | |
| 26 | 20P-46-71320 | ADAPTER | 5001-@ | |
| 27 | 07020-00000 | FITTING,GREASE | 5001-@ | |
| 28 | 08034-00536 | BAND | 5001-@ |